The most useful solar terms to understand first are kW (power), kWh (energy), kWp (rated PV capacity), CUF (capacity utilisation factor), PR (performance ratio) and DC/AC ratio (the relationship between panel capacity and inverter capacity). Each describes a different part of the system, so they should not be used interchangeably.
Capacity and energy: kW, kWh and kWp
kW, or kilowatt, is a unit of power. It describes the rate at which a building is using electricity or equipment is delivering it at a particular moment. A 20 kW load is a power level, not a monthly consumption figure.
kWh, or kilowatt-hour, measures energy over time. It is the unit commonly called one electricity “unit” on Indian bills. If a 2 kW load runs for three hours at a steady rate, it uses 6 kWh. kWp means kilowatt-peak and is used for the rated DC capacity of solar modules under standard test conditions. These three terms answer different questions: how much power, how much energy, and what rated panel capacity.
DC and AC: two forms of electrical power
Solar modules generate direct current (DC). Most buildings and the electricity grid use alternating current (AC). An inverter converts the DC electricity from the array into AC electricity that can be used by the building or exported through an approved connection.
You may see a proposal list a DC capacity in kWp and an AC inverter capacity in kW. Keep both figures in view. If a proposal gives only one capacity number, ask which side of the system it describes. That simple clarification makes comparisons between quotes more meaningful.
CUF: how much energy a plant produces relative to its rated capacity
Capacity utilisation factor (CUF) compares the actual energy generated over a period with the energy the plant would have generated if it operated at its rated capacity continuously during that period. It is usually expressed as a percentage. For a solar plant, CUF reflects the fact that sunlight is not available at full strength around the clock.
CUF is useful for comparing an annual generation estimate with installed capacity, but it should not be treated as a universal constant. Location, weather year, module orientation, shading, system losses, downtime and the capacity definition used in the calculation all matter. When reviewing a quoted CUF, ask for the annual kWh estimate and the formula or assumptions behind it.
PR: a way to look at system performance
Performance ratio (PR) is a measure used to assess how effectively a PV system converts the available solar energy at the array plane into delivered electrical energy, relative to its rated characteristics. It helps account for losses in a system rather than simply describing how sunny the location is.
PR can be affected by module temperature, inverter conversion, wiring, mismatch, soiling, shading and availability. It is most useful when its calculation method and measurement period are clear. A PR figure without context can be misleading: ask whether it is a design assumption, a modelled estimate or a measured operating result.
DC/AC ratio: why panel and inverter ratings differ
The DC/AC ratio is the PV array’s DC nameplate capacity divided by the inverter’s AC rated capacity. For instance, a 120 kWp array paired with a 100 kW AC inverter has a ratio of 1.2. This is just an example; it is not a recommendation for every project.
A larger DC array can help an inverter operate closer to its useful range for more hours, especially when sunlight is below peak conditions. At high irradiance, the inverter may limit output to its AC rating, a behaviour commonly called clipping. Designers consider energy yield, equipment specifications, economics and grid limits when selecting the ratio.
Irradiance and irradiation: similar words, different meanings
Irradiance describes the instantaneous power of sunlight falling on a surface, usually expressed in watts per square metre. Irradiation describes solar energy received over a period, often expressed in kilowatt-hours per square metre per day or year.
You may not see these terms on every commercial quotation, but they matter in generation modelling. A location’s solar resource is one input; the array’s tilt, direction, shading and operating characteristics determine how much of that resource becomes useful electricity.
Net metering, gross metering and export
These terms describe how electricity exchanged with the grid is measured and accounted for. Under net metering, imported and exported electricity may be adjusted against each other according to the applicable rules. Under gross metering, exported generation and imported consumption may be accounted for separately. The exact arrangements, eligibility and settlement method depend on current state regulations and the relevant DISCOM.
Do not assume that a system in one state will receive the same treatment in another. Ask the project team to identify the applicable regulation, consumer category, sanctioned load limits, metering arrangement and any export restrictions for your site.
Load profile, sanctioned load and maximum demand
A load profile shows how a building’s electricity use changes over time. It can reveal whether the site consumes most power during sunny hours or whether its demand rises after sunset. This is important because solar electricity is most directly useful when it coincides with on-site consumption.
Sanctioned load is the supply capacity approved for the consumer connection, while maximum demand is the highest demand recorded over a defined billing interval under the applicable metering method. These are not the same as monthly energy consumption. A solar project should be checked against the building’s electrical connection and actual load data.
A short glossary is useful; the bill and design are better
Terms help you understand a proposal, but they do not replace project documents. Keep the electricity bills, interval data if available, roof layout, single-line diagram, module and inverter datasheets, generation estimate and metering assumptions together. Ask the designer to explain any number that appears without a unit, period or calculation method.
A good discussion is not about memorising every abbreviation. It is about knowing what each figure measures and checking that the proposal connects those figures to your building’s real operating pattern.
Questions readers often ask
What does CUF mean in solar?
CUF, or capacity utilisation factor, compares energy generated over a period with the energy that would be generated by operating at rated capacity continuously over that period.
What is PR in a solar plant?
Performance ratio is a measure of how effectively a PV system converts available solar energy into electrical output, accounting for system losses under the chosen calculation method.
What is the DC/AC ratio?
It is the PV array’s DC nameplate capacity divided by the inverter’s AC rated capacity.
Are kW and kWh interchangeable?
No. kW measures power; kWh measures energy used or generated over time.
Does net metering work the same across India?
No. The rules and settlement arrangements depend on current regulations, consumer category and the relevant state and DISCOM.
Planning solar for your business?
Start with your electricity bills, operating profile and site details. A project discussion is more useful when it begins with the way your building actually uses energy.